On the west side of the Warm Springs/South Fremont BART station, a 250-foot pedestrian bridge crosses five Union Pacific tracks and comes down into a plaza with public art and amphitheater seating. It opened to pedestrians and cyclists on February 3, 2022, as Patch reported at the time. BART described it as a direct link between the station and the businesses, offices and homes of the Innovation District.
That bridge covers the first leg of the walk from home or train to work. The second leg is a crossing over Interstate 880, and that one is still on the drawing board. If you're weighing Warm Springs because of where you work, this matters. A home here today puts you a short drive or a bus ride from the largest employment center west of the freeway, not a walk. The planned bridge would add walking and biking as a second way to get there, but that option hasn't been built.
The Job Side Kept Building in 2026
The employers around Warm Springs spent 2026 adding production lines and campus space.
The Tesla factory had the most visible change. On an earnings call in January, Tesla announced that Model S and Model X production at Fremont would wind down the following quarter. The plant would keep building Model 3 and Model Y, and the S/X space would be converted to build Optimus humanoid robots. CBS News Bay Area reported that the goal was one million robots a year, with production expected to start by the end of 2026. The same report said Elon Musk had stated there were no plans for layoffs in Fremont and that Tesla could hire more workers. On April 1, Electrek reported that Musk had confirmed S/X production had stopped. By July, Tesla's Q2 update said the S/X lines had been decommissioned and the first Optimus lines were being installed. The Q3 2026 update, released in October, said Optimus production had begun in Fremont on Tesla's high-volume lines. It listed the operation as being in "Early Ramp" and called the robots coming off the line its first production-quality bots. The one-million figure is still a target. What exists today is a working line in its early ramp.
Tesla is one of several employers here. In a January 6 column in the Tri-City Voice, Mayor Raj Salwan wrote that the "Innovation District in Warm Springs—home to companies like Tesla, Lam Research, Seagate and Western Digital—continues to grow." The city's 2025 Year-End Council Priority Progress Report, published in January 2026, says Fremont led the Silicon Valley and greater Bay Area region in total commercial square footage leased in 2025, a first for the city. The report also says Fremont accounted for 75 percent of Silicon Valley's advanced manufacturing leases that year. The same report lists the full lease-up of the Fremont 880 Technology Center, groundbreakings at Campus at Bayside and the Palisade Fremont Innovation Center, and an application for Sobrato's Tech Campus. The city expects those projects to bring in more than $20 million through impact fees and property, sales and business taxes.
Location matters for a Warm Springs buyer. The Palisade Fremont Innovation Center is at 43990 Fremont Boulevard in the 94538 zip code, on the South Fremont side. Campus at Bayside is farther north, in the Bayside area at Lakeview and Gateway boulevards. The Mercury News reported that it broke ground in July 2025 as a six-building, 473,250-square-foot industrial project with no tenant named yet. The city also installed two new 75-megavolt-ampere transformers in the Bayside and Warm Springs districts. It counts more than $1 billion in utility infrastructure investment serving Fremont. Grid capacity has to be in place before manufacturers can move in, so the transformers point to more industrial tenants coming to these districts.
Where the Walking Route Stops
On its project page, the City of Fremont states that "there is no existing direct bicycle/pedestrian route from the Warm Springs/South Fremont BART Station to the major employment center west of I-880." The city's answer is the I-880 Innovation Bridge & Trail Project, also called East Bay Greenway Reach 6. It's a bicycle and pedestrian crossing over the freeway, and the city describes it as connecting 4,000 new housing units in Warm Springs/South Fremont to major employers that provide 40,000 jobs. The design calls for a 200-foot pylon with twisting cables over a curved main span. The city intends it as a landmark for the Innovation District.
The project has been moving forward. The City Council adopted the project's environmental document on December 6, 2022, in Resolution 2022-61. In its vehicle registration fee compliance report to the Alameda County Transportation Commission, dated December 22, 2025, Fremont listed the bridge at "97% Design in process." The city's project page says $77.5 million in construction funding "is being pursued." Subject to that funding, construction was proposed to start in spring 2026 and finish in spring 2028. In Alameda CTC's draft 2026 Countywide Transportation Plan project list, the project, now titled "Innovation District to Bay Trail," carries a planning-level cost of $85 million.
Before you count a walk to work in a purchase decision, find out where funding and construction stand on the day you buy. The project's place in the county plan is a good sign, but a draft cost estimate is not money in hand.
How the Trip Works Now
Until the bridge is built, getting from the station side to the jobs is the same as it was in 2022. You can walk or bike as far as the West Access Bridge and plaza. Beyond that, you drive or take the bus. AC Transit Route 239 runs daily between Fremont BART and Warm Springs/South Fremont BART, then continues toward Milpitas Boulevard and Dixon Landing Road by way of Warm Springs Boulevard, Millmont Drive and Kato Road. The current timetable is posted on AC Transit's Route 239 page.
For a buyer who works in the district, the useful question is which way the daily trip runs: the BART-side bridge, Kato Road, or I-880. Being close to work in a straight line can still mean a freeway on-ramp at shift change, while a street a little farther out may leave you a surface-street drive. The planned crossing would change that math for some streets and not for others, so compare homes against the route as it runs today and treat the bridge as possible future value.
If you're also weighing commutes beyond Fremont, our guide to Fremont neighborhoods for Silicon Valley commuters covers the north-south routes. Our Warm Springs daily-life guide covers the neighborhood beyond the commute.
What Fremont's Market Looks Like This Fall
Bay East Association of REALTORS publishes monthly statistics for detached single-family homes across all of Fremont. These are citywide numbers, not a separate Warm Springs figure, but they show the market a Warm Springs buyer is competing in.
| Month | Median sale price | Sale price to list price | Average days on market | Months of supply |
|---|---|---|---|---|
| November 2025 | $1,666,000 | 105% | 21 | 0.7 |
| December 2025 | $1,700,000 | 102% | 33 | 0.5 |
| March 2026 | $1,750,000 | 106% | 12 | 1.9 |
| April 2026 | $1,875,000 | 105% | 17 | 1.8 |
| September 2026 | $1,575,000 | 103% | 18 | 1.4 |
| October 2026 | $1,700,000 | 101% | 24 | 1.5 |
In October 2026, Fremont buyers paid an average of 101 percent of list price, and homes took about 24 days to sell. In March, they paid 106 percent, and homes sold in 12 days. The median dipped to $1,575,000 in September, then came back in October to $1,700,000, the same figure as December 2025. The month-end supply in October was 108 active listings, about 1.5 months of inventory. Going into last winter, Fremont had 0.7 months of supply in November 2025 and 0.5 in December 2025.
So this fall, a Warm Springs buyer has a little more inventory to choose from and a bit more room to negotiate than in spring, at prices close to last winter's. That makes this a reasonable time to buy based on the commute as it works now. You don't need to pay extra for a bridge that hasn't been funded.
Quick Answers
Can you walk from Warm Springs BART to the job center west of I-880 today? Not on a direct route. The West Access Bridge, open since February 2022, connects the station to the Innovation District on its west side. The city's planned I-880 Innovation Bridge is the piece that would carry pedestrians and cyclists over the freeway to the employment center.
Is the Tesla factory still building cars? Yes. Tesla said the Fremont plant would keep Model 3 and Model Y production while the former S/X space switched to Optimus. Its Q3 2026 update reported that Optimus production had begun there in an early ramp.
Are the Fremont market figures above specific to Warm Springs? No. They are Bay East's citywide figures for detached single-family homes, covering November 2025 through October 2026. Warm Springs condos and townhomes trade in their own price bands.
If you're choosing a home in Warm Springs around where you work, the Joseph Sabeh Group can compare specific streets against the commute as it runs today and keep you updated on the Innovation Bridge as its funding is decided. When you're ready to compare routes and homes, we'd be glad to help. Work With Us.